WALL TIE REPLACEMENT

Cavity ties are stainless steel connectors installed within cavity walls to securely link the inner and outer layers of masonry together. They help maintain structural stability while allowing the wall cavity to perform its role in moisture control and insulation.

Over time, existing wall ties can corrode or fail due to age, moisture, or poor original materials, which can lead to wall movement, cracking, or bulging brickwork.


At Clover Construction, we specialise in identifying and replacing failed or corroded cavity ties that compromise the stability of masonry walls. We safely restore the connection between internal and external brickwork, ensuring the structure remains secure, durable, and protected against further movement or deterioration.

BULGING OR BOWING BRICKWORK

WALL SEPARATION OR MOVEMENT

STAIR-STEP OR HORIZONTAL CRACKING

WATER PENETRATION THROUGH WALLS

RUST STAINS ON EXTERNAL MASONRY

AGEING OR POOR-QUALITY ORIGINAL TIES

LOOSE OR DRUMMY BRICKWORK

LOCALIZED BRICKWORK DISTRESS

MAINTAINS WALL STABILITY

IMPROVES BUILDING SAFETY

PREVENTS STRUCTURAL FAILURE

PREVENTS MOISTURE INGRESS

PROTECTS THE BUILDING ENVELOPE

EXTENDS STRUCTURAL LIFESPAN

REDUCES MAJOR REPAIR COSTS

STOPS PROGRESSIVE WALL DAMAGE

RESIDENTIAL PROPERTIES

COMMERCIAL BUILDINGS

HERITAGE BUILDINGS

INDUSTRIAL FACILITIES

STRATA AND REMEDIAL PROJECTS

NEW CONSTRUCTION PROJECTS

MULTI-STOREY DEVELOPMENTS

PROPERTY MAINTENANCE work


OUR STEP-BY-STEP APPROACH

01 INSPECTION

We inspect the masonry to identify signs of tie failure and determine the extent of any structural movement.

02 DIAGNOSIS & LOCATION

We locate existing ties and determine the extent of corrosion or failure.

03 ACCESS WORKS

Selected mortar joints or bricks are carefully opened to access the cavity.

04 INSTALLATION OF NEW TIES

New stainless steel cavity ties are installed to securely reconnect masonry leaves.

05 BRICK RESTORATION

Disturbed brickwork is reinstated and matched to the existing wall.

06 REPOINTING & SEALING

Mortar joints are repointed to restore strength and weather resistance.

07 FINAL INSPECTION

We confirm all ties are correctly installed and the structure is fully stabilised.